Planning in Epochs

§3.3 Big asks get an approved plan — then it’s binding

SEE IT
· · ·A big feature just landed on you: “add billing.” That’s a mega-ask, not a task. The operator’s move is to run it as an epoch.

These five steps are the loop that keeps a big ask from becoming a confident mess. They’re scrambled. Put them in the order that stops the disaster before it starts.

DO IT

Drag the steps into the right order.

  1. 1 Move to the next phase — no re-asking what’s already approved.
  2. 2 Check phase one against its own verification line before moving on.
  3. 3 Have the agent write a plan: phases, what ships each phase, how each is verified.
  4. 4 Build phase one only; ship it as a complete, verified unit.
  5. 5 Read the plan; correct the scope; approve it — now it’s binding.
Earn the rule to move on.